Edelbrock 2010 Instrukcja Instalacji Strona 12

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 29
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 11
©2014 Edelbrock LLC
Part #1596, 1597, 1598, 1599
Brochure #63-1598
Rev. 9/19/14 - QT/mc
Edelbrock E-Force Supercharger System
2010-2014 Camaro SS
Installation Instructions
Page 10
27. Use a flat head screwdriver to loosen the worm clamp
holding the inlet tube to the air box lid then remove the air
box lid by pushing the lock tabs back.
28. Disconnect the passenger side PCV tube from the valve
cover then use a flat head screwdriver to loosen the worm
clamp retaining the air intake tube to the throttle body.
Remove the air intake tube and PCV hose.
29. Use a 15mm socket and a breaker bar to loosen the
tensioner and remove the serpentine belt.
30. Disconnect the throttle body control connector on the
passenger side of the throttle body.
31. Use a 10mm socket to remove the four bolts retaining
the throttle body and set it aside.
32. Push down the white tab on the front EVAP hose fittings
and disconnect them from the manifold and the EVAP
solenoid.
33. Disconnect the Manifold Air Pressure sensor and EVAP
solenoid electrical connectors.
NOTE: 2013 model years disregard Step 34 and proceed to
Step 35. 2014 model years proceed with Step 34.
34. Disconnect the PCV tube from the engine valley cover.
NOTE: Step 35 only pertains to 2013 model years. Please
disregard otherwise.
35. Remove the driver side PCV on the rear of the diver side
valve cover and on the passenger side of the throttle body.
Przeglądanie stron 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 28 29

Komentarze do niniejszej Instrukcji

Brak uwag